Hi. I have a 15kw generator and a 6 ton heat pump. When the thermostat calls for heat, and the contactor tries to engage the pump sucks all the electricity, trying to start, and the 24v control board goes into a 5 minute time delay. I was wondering if I could put a capacitor across the 24v side of the 110v/24v transformer that would give the control board enough power till the pump starts, to stop this from happening, and if so, what size capacitor could I use? Thanks
-